Chalmers Conferences, LCM 2013

THE BENEFITS OF APPLYING PROJECT MANAGEMENT TOOLS TO LIFE CYCLE ASSESSMENTS
Susanne Veith, Carina Maria Alles, Ivo Mersiowsky, Steve Barr, Debbra Johnson

Last modified: 2014-09-11

Abstract


Life Cycle Assessments (LCAs) that encompass complex value chains can
be challenging to manage since data is needed from different value chain
partners and information needs to flow between different players in the
value chain. However, good project planning and the application of timetested
project management tools can help practitioners to overcome
obstacles and successfully navigate the team through the study.
Project management provides a very useful tool box to LCA. For example,
RACI charts help to clearly assign roles and responsibilities within a project
team. To guarantee the appropriate timing of individual tasks, Gantt charts
can be helpful to manage the timing and the sequence of individual
activities. In this presentation, we use a case study from industry to
demonstrate how the effective integration of such project management
methods can help to successfully manage even complex value chain LCA
projects.

Keywords


Project Management; RACI chart; Gantt charts; LCA Flexography and Gravure Printing

References


Veith, S.R., Barr, S. (2008). Life Cycle Assessment: Flexographic and Rotogravure Printing Comparison & Flexographic Plate Imaging Technologies. Retrieved from http://www2.dupont.com/Packaging_Graphics/en_US/sustainability/sustainability_LCA.html

Joint Research Center (2010). ILCD Handbook - General Guide for Life Cycle Assessment (First edition).

International Organization for Standardization (2006). ISO 14040 and ISO 14044 Environmental Management Life Cycle Assessment Package.


Full Text: PDF